Chongqing News
Escalators outside Chongqing railway stations installed with “canopy”
2017-03-22 09:58:48
First four stations have been installed with canopies
Four stations including Zhengjia Yuanzi and Longtoushi have already used canopies
The external stations have many escalators, so the installation work will be conducted in two batches. In the first batch, 25 exits and entrances including that of Gaomiaocun, Eling, Qixinggang and Jiaochangkou in line 1, Jiaochangkou in Line 2, and Gongmao, Hongqihegou, Jiazhoulu, Zhengjiayuanzi and Longtoushi in Line 3 began installation in October 2016. At present, Exit 4 of Hongqihegou, Exit 1 of Jiazhoulu, Exit 1 of Zhengjiayuanzi and Exit 3 of Longtoushi have been finished.
Seeing Zhengjiayuanzi, reporters found that the canopy looks transparent and beautiful, similar to a cockpit, and it has LED lighting.
All canopies will be installed completely by the end of 2017
There are 21 exits and entrances to be installed with canopies in the first batch, and all of them are expected to be finished by the end of June.
Chongqing Rail Transit suggests that all passengers should choose other exits and entrances because those under construction will be closed. (Translated by Liu Hongyan, Fathom Language Limited)
Editor:Jiang Yiwei