新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

Line 5 expected to be in pilot run at the end of September

2017-08-15 09:47:19

Trial operation

There will be a trial run without any passengers at the end of September.

According to the cultural building plan of Chongqing transport line, Line 5 is themed on impression of Chongqing. Part of stations will be decorated with wall paintings, pictures and reliefs to show unique symbols with Chongqing characteristics, such as high-rise buildings established on the sides of river and old style groups of suspended buildings.

According to Chongqing Municipal Commission of Urban-Rural Development, the first-stage northern section of Line 5 will make a test run without passengers at the end of September.

There are ten underground stations in the first-stage northern section of Line 5: Yuanbozhongxin, Danhe, Huxiajie, Chongguang, Hemulu, Renhe, Xingfuguangchang, Ranjiaba, Dalongshan and Dashiba.

Three stations to transfer to other lines from Line 5. You can transfer long-dated Line 15, in Huxiajie Station, Line 6, loop line in Ranjiaba Station, and Line 6 in Dalongshan Station respectively.

It should be noted that it is 200m away from Yuanbozhongxin Station to Yuanboyuan Station of Line 3. There is a reserved transfer passageway between these two stations, which wasn’t built until now. So, it takes travelers about three minutes to walk outside to transfer at the beginning. (Translated by Chen Dandan, Fathom Language Limited)

Pre 1 2 3

Editor:Jiang Yiwei