video

The first stage of Chongqing Rail Transit Line 9 under construction

2018-05-23 13:25:00

ld://live.cqnews.net/vod/data/video/201805/23/a8480c29-0667-4bd8-c67d-5d8806e58975/transcode_c740b594-630a-e166-35cd-7bf20edb.mp4
The first stage of Chongqing Rail Transit Line 9 under construction
39

As another backbone of the Chongqing Rail Transit system, the first stage of Line 9 has begun to be built. It is planned to open in 2020. With a total length of 32.3 kilometers, the Line will link core areas like Yuzhong, Jiangbei, and Yubei Districts, and transfer from Line 1, Line 3, Line 6 and the Loop Line. (CQNEWS)

 

Editor: