新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

Some exits of South Square Station of Chongqingbei Railway Station temporarily closed for construction

2018-07-16 10:02:08

CHONGQING (CQNEWS) -- Recently, according to Chongqing Rail Transit Group, because of the construction transformation of the South Square Station of Chongqingbei Station of Line 3 for the construction of Line 10 and Loop Line, from now on, the Exits 2, 4 and 5 will be temporarily closed.

The Line 3, Line 10 and Loop Line meet at the South Square of Chongqingbei Station. Owing to the Line 10 and Loop Line are under construction, and the South Square Station of Line 3 is being under upgrading. As a result, the Exits 2, 4 and 5 are temporarily closed.

At present, everything is in order with the direction of different signs. Besides, an extra security inspection equipment joins in the upgrading work so as to meet the demand of passengers, especially in the rush hours in the morning and evening as well as the holidays. (Translated by Song Zhipeng, Fathom Language Limited)

Editor:Jiang Yiwei