新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Photos

Renovation of Shibati to be completed

2019-04-19 10:04:38

First open area of Shibati after renovation

CHONGQING (CQNEWS) -- The renovation of the first open area of Shibati was completed after two years. Buildings are distributed on both sides, reproducing customs of Bayu people.

Located at Jiaochangkou, Yuzhong District, this district covers a total construction area of 170,000 square meters. It started to construct in May 2017, whose total investment was expected to exceed 2 billion yuan. The main construction of the first open area was completed now, and at the same time, the construction of landscape project, lighting project and infrastructure project is to be completed.

You can enter the first open area from Jiaochangkou City Balcony. At the entrance of the first open area, you can see the stilted buildings distributed on both sides of stairs, which illustrates customs of Bayu people via special mountainous architectures. Wandering in these architectures, you’ll feel excluded or enlightened. In addition to common black bricks, red ones are reasonably used in buildings to make them less dull.

“Before the construction, workers laid planks on original stone stairs to protect them.” The relevant person said that the location of ficus virens is not damaged or changed during the conservation and restoration of the first open area, while more room is provided for their growth.

The person in charge introduced that this area, based on Bayu culture and characterized by the architecture style and life of ancient Chongqing, will be constructed to a destination for cultural tourism integrating movie-TV shooting, cultural entertainment, leisure vacation and business conference.

It’s said that the first open area will not be opened to the public. While the whole construction project is scheduled to be opened to the public in 2021. (Translated by Mao Qiao, Fathom Language Limited)

Editor:Jiang Yiwei