新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

Danzishi and Luojiaba Stations of Loop Line put into use

2019-07-02 10:05:29

Sketch of the Street of Danzishi Station of the Loop Line

CHONGQING (CQNEWS) -- According to Chongqing City Transportation Development & Investment Group Co., Ltd, the Daizishi Station and Luojiaba Station have been in service since July 1, 2019.

There have been 20 stations of the Loop Line

It’s understood that the Northeast Half Ring Road of the Loop Line was opened for trial operation on December 28, 2018, but both Danzishi Station and Luojiaba Station were not opened due to various reasons. At present, the preparatory work before the trial operation of the two stations has been completed, and passed the operation review of basic conditions of the trial. It has been put into use on July 1, 2019. So far, 20 rail transit stations of the Loop Line have been opened and 162 rail transit stations in total have been opened.

At the beginning of the trial operation of the two stations, the operating time is 7:30 to 20:30, which is consistent with the operating time of the whole line. At the same time, the loop line runs from Chongqing Library to Haixia Road, with 25 trains on line. The interval between the daily peak hours (7:30 ~ 9:30, 16:30 ~ 19:30) is 5 minutes, and the interval between the peak days and weekends is 6 minutes and 40 seconds.

Sketch of the Street of Luojiaba Station of the Loop Line 

(Translated by Luo Juan, Fathom Language Limited)

Editor:Jiang Yiwei