新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

Electrified catenary is installed

2019-07-19 09:40:13

CHONGQING (CQNEWS) -- Workers of Wuhan Railway Electrification Bureau Group Co., Ltd installed an electrified catenary on the Qianjiang Apengjiang Bridge, Qianjiang-Zhangjiajie-Changde Railway, on July 15, 2019. The total length of the railway is 336.3km, including about 23km in Chongqing, and the designed speed is 200km per hour. (Photographed by Yang Min) 

(Translated by Luo Juan, Fathom Language Limited)

Editor:Jiang Yiwei