新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

Five CRT stations resume operation

2020-03-04 09:21:34

CHONGQING (CQNEWS) -- Chongqing Transportation Development and Investment Group announced that from March 3, Guanyinqiao Station and Nanping Station of Line 3, Yangjiaping Station of Line 2 and Shapingba Station of Line 1 and the Loop Line resumed normal operations. Please arrange your travel time reasonably.

As the enterprises gradually resume production, the passenger flow of public transport in the main urban areas of Chongqing has also increased significantly.

As of 18:00 on March 2, the total passenger traffic in the main urban areas of Chongqing reached 823,000, with an increase of 46.2% from March 1. The ground transportation flow was 572,000, with an increase of 42.3% from March 1. The ground bus is prepared to carry 8,000 buses, with an average passenger capacity per shift.

By 18:00 on March 2, the passenger flow of rail transit had reached 251,000 times, an increase of 55.9% over March 1. The maximum number of on-line trains is 250, with an average passenger capacity of 94 passengers per train.

“Although the growth of passenger flow is obvious, the overall passenger flow is not large, only 13.9% of the same period last year.” Chongqing Transportation Development and Investment Group said it expected that in the future, with the gradual recovery of various production and operation activities in Chongqing, the growth rate of public transport passenger flow would also accelerate.

Chongqing Transportation Development and Investment Group reminds passengers to wear masks throughout the travel and try to disperse the ride. (Translated by Luo Juan, Fathom Language Limited)

Editor:Jiang Yiwei