新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

CRT Xiejiawan, Shapingba Stations are temporarily unavailable for in-station transfer

2020-03-12 10:21:25

Xiejiawan Station and Shapingba Station are temporarily unavailable for in-station transfer. Continuous transfer charging can be launched in July as soon as possible. (Provided by Chongqing Rail Transit Group)

CHONGQING (CQNEWS) -- Recently, Chongqing Rail Transit Group announced that the transfer channel of Xiejiawan Station will be completed by the end of this year as soon as possible, and Shapingba Station will be available for transfer in April next year. Before the completion of the transfer channel of the two stations, the continuous charging for outbound transfer will be launched in July this year.

According to Chongqing Rail Transit Group, Shapingba Station is a transfer station for Loop Line, Line 1 and Line 9, and Xiejiawan Station is a transfer station for Loop Line and Line 2. The transfer channels at these two stations were constructed by another company. As the auxiliary project of the transfer channel has not been completed, at this stage, the two stations are temporarily unavailable for in-station transfer.

It can be seen from Xiejiawan Station of Line 2 that if you want to transfer to Xiejiawan Station of Loop Line, you need to swipe your card first to exit the station and then swipe your card again to enter the station. In this way, the ticket will be charged again.

In order to further facilitate passenger’s travel, Chongqing Rail Transit Group stated that they have been cooperating with Chongqing Payeasy Company and other units to plan to calculate the fare of the above two stations according to the transfer station, so that passengers can enjoy continuous transfer charging discounts. That is to say, after passengers swipe their cards at Shapingba Station and Xiejiawan Station, they will be able to enjoy continuous charging when they enter the stations at Shapingba and Xiejiawan corresponding to another line within a certain time. All the gates at the station were reconstructed and tested online. (Translated by Luo Juan, Fathom Language Limited)

Editor:Jiang Yiwei