Chongqing News
Main body of Wanzhou Xintian Yangtze River Bridge completed
2021-09-08 09:26:59
CHONGQING (CQNEWS) -- On September 2, the main body of Wanzhou Xintian Yangtze River Bridge was completed. The Bridge is a single-span, double-hinged steel box girder suspension bridge with a main span of 1020 meters and a total length of 1770 meters.
The Bridge is expected to be opened to traffic in September 2022, when the 80km-long urban ring road in Wanzhou will be closed. (Photographed by Xie Zhiqiang/Vision Chongqing) (Translated by Wang Huixin, Fathom Language Limited)
Editor:Jiang Yiwei